(Photo credit: A.N.)
Jun 4, 2025
5 MW of approved grid power, 3 miles from Downtown Dallas
ITEM |
COST ($/kWh) |
---|---|
Electricity Supply | $0.0356 |
Transmission, Distribution, & Ancillary Costs |
$0.0086 |
TOTAL | $0.0442 |
NOTE: Energy costs are estimated based on comparable site performance in ERCOT North.
STATE | LOCATION | CAPACITY | LAND | INFRASTRUCTURE | DEAL STRUCTURE |
---|---|---|---|---|---|
TX | Dallas ~3 mi from downtown |
5 MW | 6 ac | Raw Land Security Fence Municipal Water |
3 yr lease + extension JV |
The site has an approved Facility Extension Agreement (FEA) for 5 MW to be delivered on the following schedule:
The site is located in ERCOT North and served by Oncor Electric. Delivered power is scheduled to be 3-phase, 13.2 kV.
The site is falls within the City of Dallas and is located approximately three miles from downtown in an industrial area.
The property is suitable for containerized data centers or permanent structures. The site consists approximately six acres of raw land with a security fence.
The site developer has requested additional capacity from the Oncor, which is anticipated to be 5-10 MW. The delivery of this power is not yet scheduled nor guaranteed.
To support future expansion, the site developer controls additional acreage adjacent to the property.
Nearby infrastructure of interest for data center operations include:
This post and the information it contains are provided for informational purposes only. Coventry Enterprises, LLC offers no guarantee that the details in this post are accurate.
The information in this post reflects a good faith description of the property based on communication with the site developer, individual research, and previous experience.
Zac Coventry specializes in energy portfolio management for large loads. He helps data center operators, energy managers, and private equity investors minimize CapEx and operational costs through supply chain management, energy brokerage, and strategic advising.