Digital Energy Brief

(Photo credit: ChatGPT)

Site List

Nov 27, 2025

For more information on a site, click the link in the table.

Location Capacity Energy Cost Land Details
Dallas, TX 5 MW ≤$0.05/kWh 6 ac Substation adjacent
Nuevo León, México 1,000 MW ~US$0.19/kWh 10 ac Industrial park
Columbus, GA 10 MW approved
Option for 25 total MW
≤$0.05/kWh 44 ac Substation adjacent
Memphis,TN 28 MW ≤0.05/kWh 13 ac ~5 mi from downtown
Alabama 100 MW front of meter
Behind the meter potential
~$0.06/kWh 20 ac Brownfield
South Texas 20 MW ~$0.05/kWh 3.2 ac Substation adjacent
Nolan County, TX
Taylor County, TX
≥500 MW
240 MW solar
400 MW-2h BESS
~$0.05/kWh 300 ac Greenfield
Substation adjacent

Energy cost numbers are indicative only and reflect assumed utilization, curtailment behavior, and current tariff structures; actual economics will depend on tenant operations and market conditions.

This post is provided for informational purposes only. Coventry Enterprises, LLC and Digital Energy Brief make no warranty, express or implied, regarding the accuracy or completeness of the information herein. The details are provided in good faith based on site visits and/or discussions with the utility, developers, engineers, and/or contractors. No obligations are created unless and until definitive agreements are fully executed by all parties.


The Digital Energy team specializes in site development and energy strategy for large power loads, including data centers and cryptocurrency mining. For confidential materials and site tours, please send us a message.